whats the difference between class 1 riprap ad class 2 riprap

Technical Supplement 14CStone Sizing Criteria

Technical Supplement 14CStone Sizing Criteria

Technical Supplement 14C Stone Sizing Criteria TS14C–2 (210–VI–NEH, August 2007) Flow conditions The flow conditions associated with a particular application will have a major influence on selecting the right rock sizing method. While it is difficult to .

Get Price
CHAPTER 17 BANK PROTECTION index html

CHAPTER 17 BANK PROTECTION index html

CDOT Drainage Design Manual Bank Protection Erosion Potential Channel and bank stabilization is essential to the design of any structure affected by the water

Get Price
ft Corporation © 2018 DigitalGlobe ©CNES (2018 ...

ft Corporation © 2018 DigitalGlobe ©CNES (2018 ...

bid item for riprap du class ii, iii iv is as shown on the plans. nonwoven filter bid item for riprap du class ii, iii ഠiv is as shown on the plans. nonwoven filter fabric is required beneath all rock riprap and shall be secured to slopes and bottom using pins as noted in specification 305.

Get Price
SHORE ZONE HABITAT USE BY FISHES AND CRABS IN .

SHORE ZONE HABITAT USE BY FISHES AND CRABS IN .

Table Mean densities (individuals/m2) of all shore zone fish, crabs and other macroinvertebrates captured a long beach and riprap shorelines among two sites during June to September 2012.

Get Price
Rock Riprap USDA

Rock Riprap USDA

requirements of the specified class of fill. Riprap shall not be placed until the foundation preparation is completed and the subgrade surfaces have been inspected and approved by the Technician. 5. EQUIPMENTPLACED ROCK RIPRAP . The rock shall be placed by equipment on the surfaces and to the depths specified. The

Get Price
15 Riprap

15 Riprap

3) A thickness or no more than 2 ft nor less than 1 ft. The thickness is measured perpendicular to the material surface. REVETMENT, CLASS 1, AND CLASS 2 RIPRAP Revetment riprap is the most commonly used riprap. Revetment riprap, Class 1 riprap and Class 2 riprap are required to consist of aggregate, Class F or higher.

Get Price
Material Coverage Conversion Chart Front Range Material

Material Coverage Conversion Chart Front Range Material

Material Coverage Conversion Chart All rock products, rip rap, boulders and soils are sold by the ton. ... Rip Rap Coverage 1 ton of L Rip Rap will cover 23 square feet using D50 = 9" ... Loose Rip Rap Class 6 Base 1. 75 compacted. Square feet to Cubic Yard conversion L x W = Sq. Ft. Inches deep ÷ 12 = Depth

Get Price
Stone Types Laurel Aggregates

Stone Types Laurel Aggregates

Stone Types. Click each image for product gradation details. ... 2A, Class 2, Class 3 Specifications. 1 1/2″ ... 1) Rip Rap material is subject to inspection and approval at our quarry prior to shipment. 2) All orders should be placed by 12:00 for the next days delivery.

Get Price

(1) (2) (3) Class A, Class B, and Class D. Steel Slag Steel slag cannot exceed 25% of the total mixture aggregate and be free from metallic and other mill waste. The Engineer will accept stockpiles if the total expansion is no greater than percent as determined by ASTM D 4792

Get Price
CONCRETE RIPRAP AND CRR

CONCRETE RIPRAP AND CRR

1 2" 6 9 Reinf 6 "9 Reinf 6 9 2 length of cap flashing full 8"X 18 Gage Galv CAP OPTION C CAP OPTION A CAP OPTION B GENERAL NOTES: joint sealer side of wingwalls with along ends of cap and Plug ends and seal joint 11 12 13 wingwall Abutment Face of AT WINGWALL SECT THRU RIPRAP Reinf Min 2" 1 1 15 SECTIONS THRU RIPRAP AT CAP length of cap ...

Get Price
STANDARD AND SPECIFICATIONS FOR DEBRIS BASIN

STANDARD AND SPECIFICATIONS FOR DEBRIS BASIN

riprap, asphalt, concrete, etc. 4. Freeboard: Freeboard is the difference between the design flow elevation in the auxiliary spillway and the top of the settled embankment. The minimum freeboard for Class 2 and Class 3 basins shall be 1 foot. Embankment (Earth Fill) Class 1 .

Get Price
Material Coverage Conversion Chart Front Range Material

Material Coverage Conversion Chart Front Range Material

Material Coverage Conversion Chart All rock products, rip rap, boulders and soils are sold by the ton. ... Rip Rap Coverage 1 ton of L Rip Rap will cover 23 square feet using D50 = 9" ... Loose Rip Rap Class 6 Base 1. 75 compacted. Square feet to Cubic Yard conversion L x W = Sq. Ft. Inches deep ÷ 12 = Depth

Get Price
Appendix D Guidelines for Pier Scour Countermeasures ...

Appendix D Guidelines for Pier Scour Countermeasures ...

It is recommended that for field applications, the class of riprap (II, III, or IV) used for a par tially grouted pier scour countermeasure be selected based on the economics of locally available riprap material that satisfies the gradation requirements of Section Layout Dimensions Based on laboratory studies performed for NCHRP ...

Get Price
What Is Riprap Stone? • Riprap Definition • Lakeshore Guys

What Is Riprap Stone? • Riprap Definition • Lakeshore Guys

The rocks range in size from 6 to 30 inches in diameter. They also range in shape, because "riprap" can include a variety of stone types: granite, fieldstone, limestone, and trap rock, to name a few.

Get Price
RIPRAP BASIN LOCATIONS, DIMENSIONS, AND QUANTITIES D

RIPRAP BASIN LOCATIONS, DIMENSIONS, AND QUANTITIES D

var./max. 2:1 cl d1 d1 culvert ew. d4 culvert excavate to this line and 2 1 1 cl d2 d2 cl 2 1 2 1 embankment as required d1 d1 natural channel d4 3' minimum (typical) d2 2:1 existing naturalground see note a section a a section b b section d d section e e section c c cl cl elevation view a b c e b a c d d e top of natural channel

Get Price
STANDARD AND SPECIFICATIONS FOR RIPRAP SLOPE .

STANDARD AND SPECIFICATIONS FOR RIPRAP SLOPE .

Riprap used for surface stabilization of slopes does not add significant resistance to sliding or slope failure and should not be considered a retaining wall. Slopes approaching :1 may require special stability analysis. The inherent stability of the soil must be satisfactory before riprap is used for surface stabilization. 2.

Get Price